# Standard Field Recycling1

**URL:** <https://discuss.compclassnotes.com/t/standard-field-recycling1/410>\
**Category:** Industrial Machinary\
**Tags:** research\
**Created:** [September 23, 2026, 12:47am UTC](https://discuss.compclassnotes.com/t/standard-field-recycling1/410 "2026-09-23T00:47:27Z")\
**Posts on this page:** 6\
**Page:** 1

<div class="post-metadata">

**Author:** ![FreeFormer](https://dub1.discourse-cdn.com/flex006/user_avatar/discuss.compclassnotes.com/freeformer/32/97_2.png) [@FreeFormer](https://discuss.compclassnotes.com/u/FreeFormer)\
**Post date:** [September 23, 2026, 12:47am UTC](https://discuss.compclassnotes.com/t/standard-field-recycling1/410/1 "2026-09-23T00:47:27Z")

</div>

# General Field Recycling

> **[Crapper & Sons Ltd - Kiverco](https://kiverco.com/en/case-studies/crapper-sons-ltd-keeping-operations-moving-with-kiverco-hire-solutions)**
>
> Kiverco design and build solid and robust recycling plants for the waste processing industry

Kiverco works closely with [CRJ Services](https://crjservices.co.uk/) who supply **recycling equipment on a hire basis**. CRJ were able to supply Crapper & Sons with the Kiverco mobile solution to enable them to continue full processing operations while their new MRF was being built.

[![](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/db23438f3f4a9d660747b2e32f51faacf6da40a6.jpeg "Waste Separation Process - Screening, Air Separation & Manual Picking of Commercial Waste") ](https://www.youtube.com/watch?v=tWcR6iqS38M)

**The hired mobile system included:**

- **[Kiverco DS150 Density Separator](https://kiverco.com/en/system-type/mobile-recycling-systems/density-separator)**
  - High-accuracy light/heavy separation

  - Consistent output purity across varied waste streams

- **[Kiverco PS123 Picking Station](https://kiverco.com/en/system-type/mobile-recycling-systems/picking-station)**
  - Manual sorting, air separation, and magnetic separation in one compact unit
  - Ideal for maintaining quality and recovering recyclable materials during the MRF transition

### Why hire was the perfect solution

- **No downtime** — operations continued uninterrupted
- **No long-term financial commitment** during construction
- **Immediate deployment** with rapid setup
- **Static-plant power** in a mobile, flexible format
- **Easy relocation** when the new MRF was ready
- **Confidence and continuity** for both customers and the business

This hire solution gave Crapper & Sons the operational bridge they needed during a critical phase of growth.

### The outcome

By choosing to hire Kiverco equipment, Crapper & Sons were able to:

- Maintain full processing capacity throughout MRF construction
- Continue serving customers without disruption
- Sustain high purity levels and recovery rates
- Avoid costly downtime
- Operate flexibly across their site with hybrid power options
- Transition smoothly into the new MRF once completed

And thanks to Kiverco’s proven build quality, backed by 30+ years’ engineering expertise and 400+ static plants worldwide, the hired equipment delivered continuous uptime and dependable output throughout the entire project.

 ![crapper-2](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/eca6cd46f3169089f7491fa3878d9c65f07f7f88.jpeg)  
 ![crapper-3](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/03a854356bcfe30fb51fc08aa9713dfe5829d590.jpeg)  
 ![crapper-4](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/6c60569fe78d6f79a55269bc32408e2427a01cf9.jpeg)  
 ![ds150](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/f4d78a4dd693ab7b4cc881515f9caa7dfd8d6268.jpeg)

# Static Recycling

- [Home](https://kiverco.com/en/)
- [About Us](https://kiverco.com/en/about-us)
- [Recycling Plant](https://kiverco.com/en/recycling-plant)
- [Used Equipment](https://kiverco.com/en/used-equipment)
- [News](https://kiverco.com/en/news)
- [Support](https://kiverco.com/en/service-support)
- [Case Studies](https://kiverco.com/en/case-studies)
- [Contact](https://kiverco.com/en/contact-us)

# Britaniacrest Recycling

## The Challenge

Britaniacrest Recycling Ltd, a family-owned waste management company in Surrey, has been operating since 1993. As demand for their services grew, they needed to upgrade their facility to process both Construction and Demolition (C&D) waste and Commercial and Industrial (C&I) waste more efficiently. Their key objectives were to divert more waste from landfill, generate energy from waste, reduce labour costs, and maximise operational uptime

[![](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/18c9757ace748495bf98a1a2d1b5acd68022d2fc.jpeg "Britaniacrest Recycling Ltd") ](https://www.youtube.com/watch?v=nC0UjhOIsrY)

### The Kiverco Solution

```
Primary shredder
Belt feeder
Long part separator
Magnet (4)
Waste screen
2-way drum separator
4-bay double sided picking station
2-bay double sided picking station
Flip flow screen
DS150 (density separator)
Belt weighing scales
Dust filter system
Conveyors
Material bays/bunkers
Plant stair access and walkways
Plant control system
CCTV camera system
Plant control room

```

 ![britaniacrest-1](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/fe7845daeee1d50bdb33f70f85aae91babbbd8c3.jpeg)  
 ![britaniacrest-3](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/88f6b65b41753c071851a18b37b2a74ddc05ba33.jpeg)  
 ![britaniacrest-4](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/f56c585168770eb1e72d68d20baf28979ce86000.jpeg)  
 ![britaniacrest-5](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/899a8801689ebfe246418df397b95b18c09646a1.jpeg)  
 ![britaniacrest-1308](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/8c30a1804db21017f53fbed3752a593f1bb7f0c2.jpeg)

# Binn Group

## The Challenge

Binn Group, a leading Scottish waste management company, needed an innovative recycling plant to support their growing operations and sustainability goals. As a third-generation family business and long-time Kiverco customer.

Binn Group sought a solution that would not only manage Construction and Demolition (C&D) waste but also contribute to their green energy initiatives, including converting waste into energy. The new facility needed to enhance throughput, improve material purity, and support their transition to wind-powered operations to reduce their carbon footprint.

[![](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/a9bf16cd1c9dd4c91b08727a75a606bf73821bf5.jpeg "Kiverco static plant for Binn Group") ](https://www.youtube.com/watch?v=-1Nt5H6k8zE)

##### The Kiverco Solution

- Combi screen
- Magnets (3)
- 3-way drum separator
- Double sided picking station
- Optical sorter
- 2-bay double sided picking station (2)
- 2-way drum separator
- Eddy current separator
- Conveyors
- Material bays/bunkers
- Dust extraction and filter system
- Plant stair access and walkways
- Plant control system
- Plant control room

 ![Recycling Plant for Binn Group](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/d75ee6a1a2da73906078629b128859794f4997f2.jpeg)

 ![binn-group-1](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/b89dff415c992c5dad0060aded25b3871975fc77.jpeg)  
 ![binn-group-2](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/b1b4369f8bfbf63cd400f43bbe2d6bb673c3082f.jpeg)  
 ![binn-group-3](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/85aa684335425aeb870485b87dacac274d09371d.jpeg)  
 ![binn-group-4](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/8ac349e24912287d3d5dd89f307bf4dc4048ed73.jpeg)  
 ![binn-group-5](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/28e3ab8cbb43692731e72fecbea6a0ba6ea417db.jpeg)  
 ![binn-group-6](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/4a5f301e5e3f771329fd1782ae3604e0f682ce4e.jpeg)  
 ![binn-group-7](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/9db0f816f8ba4a3cba3a3c938fe0c1b80f968ab7.jpeg)  
 ![binn-group-8](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/e8a5f86664b9f6d6e0910a7b2a1d55f0c6d40132.jpeg)  
 ![binn-group-9](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/eacba49bb67f04261815ed4b12abac5071bcc19c.jpeg)  
 ![binn-group-10](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/e31e586ef0f26716a4fa3c503328f2966c0f64d2.jpeg)  
 ![binn-group-11](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/254eb0aaa8386f3416f73ace453b1a2f345c4989.jpeg)  
 ![binn-group-12](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/bb8df21af9ded2efade2d293d9434043e423c342.jpeg)  
 ![binn-group-13](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/1b2ef97b8b8ebab8e05f0dee450ef38c56d156f7.jpeg)  
 ![binn-group-14](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/4c6fa55c279375d299e8ca262770cb8b4b25cfeb.jpeg)

# The Challenge

## Dulsco, UAE

Dulsco, one of the UAE’s largest waste management companies, is committed to sustainable practices that help the local community thrive. Their goal was to install a waste processing plant capable of achieving exceptionally high levels of separation and recovery, maintaining consistent purity throughout the plant’s lifespan. This project was crucial to meet the growing demand for Single Stream (SS) and Commercial and Industrial (C&I) waste processing in Dubai.

[![](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/732df8ebb19279374399cb02f719d5650de9f3dd.jpeg "Kiverco Bespoke Plant. Client: Dulsco. Location: Dubai, UAE. Application: C&I MSW") ](https://www.youtube.com/watch?v=RZNV4sN9ewg)

 ![dulsco-slide](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/4fe80ccb4316112d87c7ca98e6df2479982efa5a.jpeg)

## The Kiverco Solution

```
Bag opener
Pre-sort station
Trommel screen
Ballistic separator
Magnet
Eddy current separator
2-bay picking station
Twin line double sided picking station
Conveyors
Material bays/bunkers
Plant stair access and walkways
Plant control system

```

 ![dulsco-2](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/2da7e77495c8703b2d8dde31ad9617e820eb3b03.jpeg)  
 ![dulsco-3](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/7a7aaff81c0003ed769e3157df824986b6da3395.jpeg)  
 ![dulsco-4](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/363e0a7be9d3beeec932170c059c87354117f866.jpeg)  
 ![dulsco-5](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/2970f5615f4a641520c6f64740c70975c313af54.jpeg)  
 ![dulsco-6](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/0333c6a5d5fa600dd7ce51a60674ac604f55bb07.jpeg)  
 ![dulsco-main](https://europe1.discourse-cdn.com/flex006/uploads/ccn1/original/1X/894204ed145e2668e579b84d51a01d7b9ca290c7.jpeg)

---

<div class="post-metadata">

**Author:** ![Garethj1](https://avatars.discourse-cdn.com/v4/letter/g/df788c/32.png) [@Garethj1](https://discuss.compclassnotes.com/u/Garethj1)\
**Post date:** [September 23, 2026, 2:29pm UTC](https://discuss.compclassnotes.com/t/standard-field-recycling1/410/2 "2026-09-23T14:29:04Z")

</div>

I think the UAE example is a good one. Being able to provide real world local solutions to them proves our credibility and gives them a bit of comfort too. Being able to hire equiptment for the test would solve a problem for us also?!

---

<div class="post-metadata">

**Author:** ![Lucval](https://avatars.discourse-cdn.com/v4/letter/l/a3d4f5/32.png) [@Lucval](https://discuss.compclassnotes.com/u/Lucval)\
**Post date:** [September 23, 2026, 7:32pm UTC](https://discuss.compclassnotes.com/t/standard-field-recycling1/410/3 "2026-09-23T19:32:13Z")

</div>

Gareth, you mentioned that you have statistics on the waste generated from hospitals. Can you send those notes to me and we can extrapolate that out into the number of hospitals in Kuwait? I think there’s a couple of dozen hospitals there.

---

<div class="post-metadata">

**Author:** ![Garethj1](https://avatars.discourse-cdn.com/v4/letter/g/df788c/32.png) [@Garethj1](https://discuss.compclassnotes.com/u/Garethj1)\
**Post date:** [September 24, 2026, 11:49am UTC](https://discuss.compclassnotes.com/t/standard-field-recycling1/410/4 "2026-09-24T11:49:55Z")

</div>

Hi Lucia,

The number was 15-20% This was provided by the Kuwaitis and is on the presentation. When we talked I pointed out that this number is in line with what I found online also when putting the initial presentation together. So this is a good number to work with that is mutually agreeable.

Kuwait’s total hospital count varies a bit by source because government reporting mixes acute-care hospitals with specialized units, but here’s the clearest picture:

**Overall count:** Kuwait’s Ministry of Health and Bureau of Health data put the public sector at around 28 general and specialized government hospitals, plus 16 private hospitals — roughly 8,757 total hospital beds nationwide as of the most recent figures, with government plans to expand to about 12,230 beds. A slightly older Wikipedia summary cites 20 public and 16 private hospitals (36 total), which reflects how “hospital” is sometimes counted more narrowly (excluding smaller specialized units).

**By size (bed capacity), the major facilities are:**

Government hospitals, organized by health district — Capital: Amiri Hospital (~800 beds) and Jaber Al-Ahmad Al-Sabah Hospital (~1,168 beds, the newest and largest, often cited as one of the biggest hospitals in the Middle East); Hawalli: Mubarak Al-Kabeer Hospital (~781 beds); Farwaniya: Farwaniya Hospital (950+ beds); Ahmadi: Adan Hospital (~1,450 beds, the largest by bed count), Al-Ahmadi Hospital (~300 beds), Dhaman Al-Ahmadi (~330 beds); Jahra: Al Jahra Hospital (1,200+ beds), Dhaman Al-Jahra (~300 beds); and the Al-Sabah Medical District cluster of specialized hospitals — Al-Sabah Hospital (~300 beds), Maternity Hospital (~780 beds), Psychiatric Hospital (~691 beds), Chest Diseases Hospital (230+ beds), Ibn Sina Hospital (~279 beds), Al-Razi Hospital (~240 beds), Infectious Diseases Hospital (~224 beds), Natural Medicine & Rehabilitation Hospital (~120 beds), and NBK-Zain Hospital (~87 beds).

Private hospitals are notably smaller, generally under 250 beds: Dar Al Shifa Hospital in Hawalli (~220 beds) and Al Salam Al Assima Hospital in Kuwait City (~190 beds) are among the larger ones, followed by mid-sized facilities like New Mowasat (~112 beds), Al Seef Hospital (~105 suites), Taiba Hospital (~110 beds), Alorf Hospital (~100 beds), Al Salam Al Ahmadi (~98 beds), and Royale Hayat Hospital (~80 beds).

So in short: roughly 36-44 hospitals total depending on how you count, dominated by a handful of large government hospitals (mostly 700-1,450+ beds) concentrated in Kuwait City, Ahmadi, and Jahra, alongside a private sector of smaller facilities typically under 250 beds. I’d treat the exact public-hospital count (20 vs. 28) as approximate since sources don’t fully agree

Sources:

- [Kuwait - Healthcare (trade.gov)](https://www.trade.gov/country-commercial-guides/kuwait-healthcare)
- [Healthcare in Kuwait (Wikipedia)](https://en.wikipedia.org/wiki/Healthcare_in_Kuwait)
- [List of hospitals in Kuwait (Grokipedia)](https://grokipedia.com/page/List_of_hospitals_in_Kuwait)
- [Kuwait: number of hospital beds by sector (Statista)](https://www.statista.com/statistics/1329726/kuwait-number-of-hospitals-beds-by-sector/)

---

<div class="post-metadata">

**Author:** ![FreeFormer](https://dub1.discourse-cdn.com/flex006/user_avatar/discuss.compclassnotes.com/freeformer/32/97_2.png) [@FreeFormer](https://discuss.compclassnotes.com/u/FreeFormer)\
**Post date:** [September 24, 2026, 11:59am UTC](https://discuss.compclassnotes.com/t/standard-field-recycling1/410/5 "2026-09-24T11:59:53Z")

</div>

@Garethj1 @Lucval I will help with the better visualize these numbers in coming day.  
D

---

<div class="post-metadata">

**Author:** ![Garethj1](https://avatars.discourse-cdn.com/v4/letter/g/df788c/32.png) [@Garethj1](https://discuss.compclassnotes.com/u/Garethj1)\
**Post date:** [September 24, 2026, 2:51pm UTC](https://discuss.compclassnotes.com/t/standard-field-recycling1/410/6 "2026-09-24T14:51:30Z")

</div>

The commonly cited industry benchmark works two ways — a per-bed daily rate, and total national/system figures — since actual tonnage scales with hospital size.

**Per-bed rate (the core industry standard):** Practice Greenhealth and Medical Waste Pros both put total hospital waste generation (all streams — general, food, recycling, and clinical combined) at roughly 29–33 lbs (about 13–15 kg) per licensed bed per day in the US. WHO’s figure is narrower, covering only hazardous/clinical waste specifically: up to 0.5 kg per bed per day in high-income countries, versus about 0.2 kg per bed per day in lower-income countries — meaning hazardous waste is typically a small fraction (roughly 10–15%) of the total waste stream, not the bulk of it.

**Scaling that to annual tonnage:** at ~30 lbs/bed/day, that works out to about 5,475 lbs, or roughly 2.5 metric tons, per bed per year. So the “average hospital” figure really depends on bed count — a small community hospital (~100 beds) lands around 250 tons/year, a mid-size hospital (~200–300 beds) around 500–750 tons/year, and a large tertiary hospital (500+ beds) can exceed 1,250 tons/year.

**National totals as a sanity check:** In the US, hospitals collectively produce about 5–5.9 million tons of waste annually (Practice Greenhealth and Medical Waste Pros cite figures in that range) across roughly 6,000 hospitals — which averages out to around 900–1,000 tons per hospital per year, consistent with the per-bed math above given the average US hospital has around 160 staffed beds.

**UK/NHS context** , since you’re London-based: NHS England reports about 156,000 tonnes of clinical waste per year requiring high-temperature incineration or alternative treatment, with a per-bed rate of about 5 kg/day for standard beds (rising to 10.5 kg/day for infectious/COVID-type beds under alternative treatment protocols). That NHS figure is clinical waste only, not total hospital waste including food and general refuse, so it’s not directly comparable to the US “total waste” figures above — it’s the narrower, hazardous-adjacent slice.

So as a rule of thumb: roughly 2.5 tons of total waste per bed per year is the standard industry planning figure, with clinical/hazardous waste representing a much smaller subset of that (WHO’s 0.5 kg/bed/day ceiling).

Sources:

- [Health-care waste (WHO)](https://www.who.int/news-room/fact-sheets/detail/health-care-waste)
- [How Much Medical Waste is Produced? (Medical Waste Pros)](https://www.medicalwastepros.com/blog/how-much-medical-waste-is-produced/)
- [Waste (Practice Greenhealth)](https://practicegreenhealth.org/topics/waste/waste-0)
- [Hospital Waste Facts (Business Waste UK)](https://www.businesswaste.co.uk/waste-facts/hospital-waste-facts/)
